What computation is still worth doing when its value depends on when it finishes? The first scheduler lost to EDF and failed all five of its gates.

My part
Author — Rust simulator, Python rendering harness, preregistration
State
Generation I negative · Generation II registered, not run
■ WIN 15   □ TIE 15   ■ LOSS 170 — AGAINST EDF, 200 SCENARIOS−5.07%TOTAL UTILITY · 0 OF 5 GATES PASSED1,203 JOBS EXPIRED UNSTARTED · EDF: 37

What it does

A deterministic Rust simulator for jobs whose value depends on completion time, and a Python harness that drives a real renderer — PBRT-v4 on the CPU, pinned to one commit.

Why it exists

Deadlines are a crude model of value. A satellite image that arrives an hour late isn't worthless; it's worth less. Generation I asked whether scheduling on that utility curve beats scheduling on deadlines.

What happened

The protocol was frozen before the run: 200 synthetic Earth-observation scenarios, 9,600 jobs, 15,882 runs, five registered gates. The temporal-utility scheduler scored 524,509 against EDF's 552,525 — 5.07% worse. 15 wins, 15 ties, 170 losses. All twelve sensitivity variants negative. All five gates failed.

The detail that explains it: temporal utility let 1,203 cloud jobs expire unstarted. EDF let 37.

Generation I is retired. Generation II asks a narrower question — given the intermediate state of a render, which unit of computation is worth doing next — and allocates render samples by marginal value.

How it's built

  • tc-core → tc-ir (TOML scenarios) → tc-scheduler: FIFO, fixed priority, EDF, temporal utility, utility density.
  • tc-sim: deterministic, single-CPU, non-preemptive discrete events with JSONL traces.
  • Generation II: a Python harness with contracts and evidence under research/.

Tradeoffs and honesty

  • No simulation parameter in Generation I is a measured mission quantity. The negative result is real, but it's a result about the simulator.
  • An offline gate found the Generation II controller differs from the variance-guided baseline mainly through a noisy term. Whether that's a meaningful test of the hypothesis is an open question I haven't closed.

Where it stands

TC-R1, the primary experiment, is preregistered and not run. A review projected 1,800–4,200 single-worker hours per pass. Next: a deterministic charged-ray cost, a persistent renderer worker, and an execution freeze before anything runs.